Two side by side Gorbel® Free Standing Work Station Cranes with vacuum handling devices - 100 ft. runways and 25 ft. bridges were installed. The previous high count for a day was 500. ...
A parts manufacturer needed a way to quickly and carefully transfer parts up to 500 lbs. through a multi-stage dip tank sequence without suffering damage. Operator safety and ergonomics ...
Work Station Crane w/Telescoping Bridge with Chain Hoist helps overcome spacing issues for a supplier of machined components. “The telescoping WSC allowed us to maximize our available ...
An Electric Lift Truck Manufacturer needed a work station crane to lift truck parts of different sized and shapes from a steel cart and moved into a room where precision measuring takes ...
Industry: Manufacturer of Gears and Gear Cutting Machinery for the Auto Industry. Application: Large, heavy machined parts are brought in on pallets to have tolerances measured. Parts ...
A Free Standing Work Station Bridge Crane with a 1000# aluminum bridge and chain hoist was installed for a Manufacturer of Fabricated Stone Products. The Application was that large ...
A manufacturer in the semi-conductor industry entered into a new line of business that required components to be assembled in a class 10000 clean room. Since some bundles weighed in ...
In 1990, 275,000 passengers passed through the Leipzig/Hall Airport in Germany, by 1995 that number had grown to 2 million and today more than 4.5 million passengers per year utilize ...
This tire manufacturer wanted to improve productivity. We created an automatic monorail system that increased productivity and reduced costly mixing errors. The system was originally ...
This manufacturer wanted to improve productivity. We created a system that allows one operator to safely run a parts washing system. The system allows the operator to cover the loading ...
With a working force of only 5 warehouse people, Coutinho, Caro & Company Incorporated handles 10,000 tons of steel per month at its Compton, California warehouse. As many as 65 delivery ...
Continental Air wanted to keep the height of their building as low as possible to control costs. Therefore, by using the multiple runway carne design we were able to use a smaller bridge ...
Operating only one shift, the batch room fills enough buckets to supply the furnaces for 24 hours. Some buckets go directly to the furnaces, where they automatically discharge their ...
This customer fabricates countertops using granite and marble. In this application, workers at a new facility need to move huge slabs of granite from station to station through the ...
This customer was a manufacturer who received a multi-year contract from a large national retailer to supply retail products for regional distribution Centers. The manufacturer was ...