Continental Air Uses Total Floor Space With LOUDEN Multiple Runway Crane
Continental Air wanted to keep the height of their building as low as possible to control costs. Therefore, by using the multiple runway carne design we were able to use a smaller bridge beam on the crane and still meet Continental’s capacity requirements; thus maintaining Continental’s building requirements.