Work Station Crane Solves Handling Problems


An automotive manufacturer in Canada needed a process for overhead material handling when their plant converted from a warehouse operation to a manufacturing operation. They chose Free Standing Bridge Crane systems to serve their engine/transmission assembly lines because the building could not support Ceiling Mounted Bridge Cranes. The bridge crane system has three bridges on a single runway which is 86’ long. Each bridge serves a work area that is approximately 28’ long.