Shipyard Increases Capacity & Flexibility With New EMH Overhead Crane
Great Lakes Shipyard recently installed a new overhead bridge crane in its main fabrication building. Built by Engineered Material Handling (EMH), the new overhead crane incorporates two independently operated 5-ton lifts, which gives the installation a combined capacity of 10 tons.
Download Case Study
Hannah Postolka Marketing Manager
330-220-8600
Hpostolka[at]emhcranes.com
Visit Website