Busting Up "Log-jams" With The G-Jib®


he fabrication area is where covers and guards for electronic controls are built in a wide variety of shapes and sizes. The most common components being moved are tubular and angled steel, which could be as light as 15-20 pounds or as heavy as 500 pounds. The problem was an overhead bridge crane was shared between multiple work bays causing production delays when more than one person needed to use it.
Download Case Study
Busting Up
Gorbel Inc.

Jeff McNeil or Rob Beightol
800-821-0086

Visit Website
Monorail Manufacturers Association, Inc.