Productivity Doubles With Help of Work Station Bridge Crane


Two Free Standing Work Station Bridge Cranes with 1 ton aluminum bridges and chain hoists with vacuum end effectors were installed. "The Gorbel system has worked out very well," said Moeller. "One operator is able to do 30 cycles per shift now, where before we may have only done 15. Plus, there have been no injuries."
Download Case Study
Productivity Doubles With Help of Work Station Bridge Crane
Gorbel Inc.

Jeff McNeil or Rob Beightol
800-821-0086

Visit Website
Monorail Manufacturers Association, Inc.