Cleveland Tramrail® Monorail Reduces Maintenance and Increases Safety In Lab


A 2-ton Cleveland Tramrail® monorail system, with roughly 90 feet of straight and curved Tarca® track and Safpowrbar, was installed to replace the existing monorail. New support steel was installed and two new columns on concrete piers in front of the loading dock. Header beams and bracing were bolted to the new columns to provide rigid support to the monorail and switches. With the switches secured by the rigid mounting, the system was aligned once, and after repeated use, continues to remain properly aligned.
Download Case Study
Cleveland Tramrail® Monorail Reduces Maintenance and Increases Safety In Lab
Gorbel Inc.

Jeff McNeil or Rob Beightol
800-821-0086

Visit Website
Monorail Manufacturers Association, Inc.