Unique Rail System “Off/On Ramp” Allows Quick Hoist Exchange on Production Line
A computer controlled renovation and refurbishing line with specific time and efficiency goals relies heavily on the proper continuous function of all of its components. To minimize the line’s downtime, engineers developed a unique “off-ramp/on ramp” set up. Features and benefits: Minimal line downtime due to the rapid exchange of hoists. Computer controls and monitors ensuring peak efficiency and same model of hoists allows for an ample in-0hous inventory.
Download Case Study
Joshua Karczewski, Marketing Coordinator
800-888-0985
joshua.karczewski[at]cmworks.com
Visit Website