Gillette Company Manufacturing


Project Overview: Master Plan and Procurement support for an expansion to the facility and introduction of new product lines. Optimization of Material Flow and Storage Design for all RM, WIP and FGs in the campus. Generate multiple alternatives to arrive to the optimized configuration of technologies based on operational requirements and ROI requirements. Detailed equipment specification of all technologies and evaluation of vendor proposals and designs. (Dematic, Daifuku, E80, SSI Schaeffer). Technologies Included: 25,000 position pallet ASRS (90’ high). Robotic palletization of manufactured product. Customized Tote/Tray Robotic Palletization/Depal.
Download Case Study
Gillette Company Manufacturing
St. Onge Company

Jerrica Riopelle
717-840-8181

Visit Website