Output Per-Hour Increases With Help Of Cleveland Tramrail™ Systems
Business: Primary Metal-Iron Pipe Foundry Application: The cranes handle patterns and flasks used to make ductile iron fittings. They are used to prepare each pattern/flask combination for entry to a mold conveyor line where they will be filled with sand and drawn out for molding. The Problem: This line had a severe lack of material handling equipment. Pieces were often being moved with forklifts 3-4 time to accomplish the task of preparing the flasks for the mold loop.
Download Case Study
Jeff McNeil or Rob Beightol
800-821-0086
info[at]gorbel.com
Visit Website