Power Station Long Lift Wire Rope Hoist Hoist


A total of 84 catalytic converters are installed on two levels of a power plant. The individual elements of the converters are transported from ground level to a height of 200 ft. or 215 ft. The hoist was used for the initial installation and subsequently for replacing the converters which weigh 5,500 lbs. The narrow installation openings are available for transport of converter cages safely over the various levels of the building. In view of the lateral clearance on the narrow side, the task required a non-rotating true vertical lift. To solve the problem, Stahl selected a standard SH60 wire rope hoist mounted to a motorized trolley.