Distribution Center Fully Operational in Just 10 Weeks


Commercial Storage Systems, a distributor of Husky Rack & Wire of Denver, NC, completed The Dixie Group’s rack system design on schedule and material began arriving within 4 weeks. Half of the system was installed within 6 weeks and the facility was at full capacity in 10 weeks. The final rack configuration was comprised of approximately 8,000 linear feet of storage, 28 feet tall, 12 feet deep and decked with corrugated metal. When Commercial Storage Systems utilized Husky Rack & Wire’s dependable lead time, The Dixie Group Operations, LLC distribution center was operational on time.